360 Facility Work Order System Building Signange Commonly Asked Questions Cleaning Elevators Forms HVAC Mail Service Recycling Riser Management Tenant Services
Tenant Services
Page: 3 of 3 Back  | 

MISCELLANEOUS

Electrical/Telephone Floor Outlets

Installation of these requires boring and cutting. These installations must receive prior approval from the Management Office so as to minimize disturbance to other Tenants and to insure no structural damage to the building. Only Management approved contractors are allowed to do this work.

Parking

Parking is available in the five-level parking deck. The surface parking lot is located on the north side of the building.

Window Covering

Horizontal venetian blinds are the building standard window covering. Blinds should be closed and dropped each evening to sill height. This serves to make your office more comfortable during the first hours of building operation the succeeding day. Any window treatment other than blinds must be approved by Building Management. All such installation will be required to be placed on the inside of the building standard venetian blinds. No installation should block baseboard heaters if they exist in your office.

Powered by ETS. ©2024 All rights reserved. | |